Elements of support cage arriving
ITER's six-storey-tall central magnet will require a robust support structure to make sure that it remains secure and aligned in the face of the huge forces at play in the ITER machine. The very first element of the "caging" structure has been delivered by US ITER.
The different support elements provide a secure base and cage that enables the assembly to withstand thousands of tonnes of force—both pre-load, when forces are applied to the structure to keep vertical gaps and stresses from developing between the modules, and during operation in the face of the machine's internal magnetic forces.