Calls for Expertise
Reference | Title | Tender process | Current Step |
---|---|---|---|
IO/24/CFE/10030272/ADO |
PLC Frameworks Extension and Magnetics Diagnostics I&C Integration Support |
Call for Expertise Closed |
|
IO/24/CFE/10030185/SPA |
Mechanical Engineering Design and Manufacturing for the EC system |
Call for Expertise Closed |
|
IO/24/CFE/10030057/CPT |
Mechanical Engineering and Analysis Expert for 55.GL and 55.GA diagnostic systems |
Call for Expertise Closed |
|
IO/24/CFE/10029683/ADO |
Mechanical design and integration of 55.GE and 55.B9 in EQ8 (DMS) |
Call for Expertise Closed |
|
IO/24/CFE/10029839/CPT |
Call for Expertise Closed |
||
IO/24/CFE/10029528/CDO |
System Engineering Support for the Electron Cyclotron System |
Awarded Closed |
|
IO/24/CFE/10029178/JLE |
Awarded Closed |
||
IO/24/CFE/10028500/JLE |
Awarded Closed |
||
IO/24/CFE/10028482/RMO |
Awarded Closed |
||
IO/24/CFE/10028201/CPT |
Diagnostics Design Review, Windows Manufacturing and Installation Preparation Follow Up |
Awarded Closed |
|
IO/24/CFE/10027284/ADO |
Support on analysis for the diagnostic designs and integrated infrastructure |
Awarded Closed |
|
IO/24/CFE/10027950/JLE |
Awarded Closed |
||
IO/24/CFE/10027973/RMO |
Awarded Closed |
||
IO/24/CFE/10027912/RMO |
Awarded Closed |
||
IO/24/CFE/10027927/VML |
Awarded Closed |
||
IO/23/CFE/10027363/CPT |
Support to design, integration and interfaces for the ITER Bolometers |
Awarded Closed |
|
IO/23/CFE/10027406/ADO |
Awarded Closed |
||
IO/23/CFE/10026899/CPT |
Diagnostic Expert Support for 55.G8 Erosion Deposition Monitor |
Awarded Closed |
|
IO/23/CFE/10026901/CPT |
Awarded Closed |
||
IO/23/CFE/10026862/EBT |
Awarded Closed |
PLC Frameworks Extension and Magnetics Diagnostics I&C Integration Support
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Submission deadline extended until 17/12/2024
==================
The work to be performed under a Call for Expertise (CFE) covers the following activities:-The future proofing of Programmable Logic Controllers (PLC) framework and tools developed by the ITER Organization, i.e. the Unified Control Library (UCL) and Code Generation Tool (CGT), focusing on design improvements for scalability and expandability, additional library support, integration of EPICS components and functional testing;-The preparation of ITER magnetics diagnostics plant controller integration with central I&C systems, i.e. Control, Data Access and Communications (CODAC) system and Central Interlock System (CIS), covering automated procedures, configuration workflows and data archiving.
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1352Mechanical Engineering Design and Manufacturing for the EC system
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
The candidate is intended to:-
-Work with CAD designers on the development of final design components bringing preliminary designs
to final designs.
- Provide structural assessment expertise (stress evaluation and code compliance) according to nuclear
codes (ASME III, RCC-MR) and conventional codes (ASMEVIII, EN-13445).
- Provide manufacturing and welding assessments according to nuclear codes (ASME III, RCC-MR) and
conventional codes (ASMEVIII, EN-13445).
- Participate in design reviews.
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1344Mechanical Engineering and Analysis Expert for 55.GL and 55.GA diagnostic systems
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1329Mechanical design and integration of 55.GE and 55.B9 in EQ8 (DMS)
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1325Optics and Radio-Frequency Engineering Expertise for 55.E6
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
New deadline is now 25th October, 17.00 CEST.
====
The engineering activities in this contract shall aim at refining the Optical and Radio-Frequencycomponent design, with an emphasis and qualification, testing and manufacturability in view ofpreparing for their manufacturing and future installation on the ITER tokamak.
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1320System Engineering Support for the Electron Cyclotron System
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1310Cryogenics Expert Support for DMS (2024)
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
provision of services described in the Technical Specifications, ref. B7WHL9_v 1.2 (ANNEX I
in this PIN document).
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1300Propellant Modelling for DMS
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1273CFE Engineering Analysis for DMS
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1271Diagnostics Design Review, Windows Manufacturing and Installation Preparation Follow Up
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
- Mechanical design and integration
- Assessment and appraisal of engineering designs
- Follow-up of prototyping, testing and manufacturing
- Installation preparation and planning
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1263Support on analysis for the diagnostic designs and integrated infrastructure
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1261DMS PIS Advanced Development
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
provision of services.
Attachments
Awarded Company / Consortium
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1240Interface and Documentation Management Support for DMS
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
development of the Disruption Mitigation System (DMS) shall be supported towards and after
the FDR.
Attachments
Awarded Company / Consortium
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1239Mechanical Engineering Support For DMS
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Attachments
Awarded Company / Consortium
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1238Expert Support for Diagnostics I&C Integration
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
1. Perform receiving inspection and inventory management (CLM)
2. Manufacturing, assembly and installation, and cabling
3. Execute Test Plans, reproduce previous test report results and report issues
4. Operation, Maintenance, Issue tracking
5. Coordination of Lab Activities related to central CODAC installation, operation and
maintenance
6. I&C Quality Inspection (Design, Implementation, Documentation)
7. CODAC Integration of production and reference systems. I&C Methodology application
and improvement
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1237Support to design, integration and interfaces for the ITER Bolometers
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
technical activities and tasks for ITER Bolometers.
1. Update of interfaces and interface sheets between Bolometers and the diagnostic ports,
divertor and vacuum vessel, as well as the interfaces with other ITER PBSs.
2.Review of technical documents from IO and EUDA.
3.Integration of the Bolometers in the diagnostic ports, in the divertor and on the vacuum
vessel.
4.Resolution of technical actions from IO and/or DA meetings, design review, design
integration reviews and manufacturing readiness reviews.
5. Engineering Work Packages for installations.
6. Updates of the Configuration Models and other related CAD activities in liaison with
CAD designers supervised by IO.
7. Identification of technical and schedule risks.
8. Development of the calibration procedures for bolometers.
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1226ECH Subsystems Support Design and Manufacturing
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1216Diagnostic Expert Support for 55.G8 Erosion Deposition Monitor
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
Deposition Monitor Diagnostic and general support for the in-vessel diagnostic (IVD) section.
The work involves technical expertise for:
1. Supervising optical, mechanical and opto-mechanical design development related to Erosion Deposition Monitor, PDR and towards first FDR;
2. Supervise analyses like load, thermo-hydraulic, electromagnetic, structural, neutronic, safety, risk analysis etc. PDR and towards first FDR
3. Help the TRO in managing the interfaces and port plug integration during the design phase
4. Help in closing 55.G8 PDR chits and preparing for the next design review; FDR for in-vessel and Port Cell components, by generation the required documents as well as
help in solving the Chits generated during the reviews and start progress towards an FDR.
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1211Specialist Work Relating to Thomson Scattering Oversight
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
The work in this package involves technical expertise for:
1. Development of the project and technical strategy and methods needed to implement the Edge and Core Plasma Thomson scattering systems (55.C1, 55.C2) on ITER;
2. Maintenance of project implementation plans for all related work, and monitor and control cost and schedules for all related activities;
3. Technical review of progress documentation
4. Development of necessary documentation on these systems.
Attachments
Share
https://www.iter.org/industry/procurement/tenders/calls-expertise?tender=1212Melcor support on model, calculation and validation
I-PROC is ITER's new digital procurement system. If you are not yet registered on that platform, click here.
*(Example)* How to apply to this CFE is explained in below attachment Expression of Interest form
Process Evolution
Dates Information
Contract Description
the modelling and for the use of the Melcor code and to perform safety analysis in the framework
of Safety Review and for the RPrS update