Like grasping a bowl of cereal
Designed and manufactured by US ITER, who procures the central solenoid, the system has once again proved its efficiency. On Thursday 11 April, the third module was successfully lifted and positioned with a slight radial offset on top of the existing two-module stack. The 325-millimetre offset provides room for equipment and connection work to be completed before the module gets positioned in its final location, aligned on the central solenoid axis.