Pour les actualités en français, voir la page News in French.

Two massive tanks ready for the ITER cryoplant

16 May 2016 - Fusion for Energy
Read the full story on the European Domestic Agency website.
Quench_Tanks.jpg
The two quench tanks of the ITER cryoplant stored at Chart Ferox, Czech Republic
Two of the largest tanks for the ITER cryoplant have been manufactured. The massive pieces of equipment, produced by Air Liquide and subcontractor Chart Ferox, each measure 35 metres x 4.5 metres and will require an exceptional convoy to be transported from the port of Marseille, Fos-sur-Mer, to the ITER construction site.