Pour les actualités en français, voir la page News in French.

Signs

Jean Pavageau, Responsible Officer for the site layout and infrastructures.

With the site levelling works almost finished, the 85 x 122 metre Tokamak pit is becoming visible. The soil around the pit has been piled up to platform level, while the pit itself was left at its original level. What is now merely a scar in the landscape will in the future be 20 metres deep.