Pour les actualités en français, voir la page News in French.

Photos this week (24 March 2014)

The Assembly Building basemat will support the load of the heavy custom-built tools that will pre-assemble vacuum vessel components. The openings in the concrete, visible in the image, are reserved for the embedded plates that will fix the tools to the basemat.